abandoned culverts may be encountered during performance of this <br /> Project. Any such materials shall be completely excavated and <br /> removed by CONTRACTOR to the main facilities area for disposal by <br /> others. <br /> A single or double ditch is located on the inside portion of most <br /> portions of the road. These ditches carried water to the culverts <br /> which were eliminated in Task 2, Culvert Removal. In some <br /> locations, a berm is also present at the outside margin of the <br /> road. These berms will be eliminated during Task 3 , Road Grading. <br /> Cross Sections D-1 through D-18 depict the slope of the roads. The <br /> slope is defined as the angle of the road as measured perpendicular <br /> to the road running surface. The location of each cross section is <br /> depicted on Map 5, Earth Work. <br /> The gradient (rise or fall) of the road measured parallel to the <br /> road running surface was determined at each cross section point. <br /> The average road gradient as measured in the field at each cross <br /> section location is noted on each of the cross sections D-1 through <br /> D-18. <br /> Road grading will be accomplished in this task by accomplishing the <br /> appropriate reclamation specification, as follows: <br /> Any road segment whose gradient (rise or fall) exceeds five percent <br /> (5%) shall be graded so that the inside ditch(es) are eliminated, <br /> and so that upon completion of grading, the slope of the road <br /> (angle of the road measured perpendicular to the road running <br /> surface; see cross sections) is a minimum of two percent (2%) to <br /> the outside margin of the road. <br /> Any road segment whose gradient (rise or fall) is five percent (5%) <br /> or less shall be graded so that the inside ditch(es) are <br /> eliminated, and so that upon completion of grading, the slope of <br /> the road (angle of the road measured perpendicular to the road <br /> running surface; see cross sections) is a minimum of five percent <br /> (5%) toward the outside of the road. <br /> Map 5, Earth Work, depicts the portions of the road network which <br /> will either be graded to a flat slope or be graded toward the <br /> outside. <br /> Material to complete the road grading and ditch elimination work <br /> shall be obtained from the crown of the road and from the outside <br /> edge of the road. Material will not be obtained from the cut slope <br /> (inside margin) of the road. Where material is excavated from the <br /> outside edge of the road, no cut slope shall exceed 3H:1V. All <br /> cuts shall be uniformly excavated so that the down slope extent of <br /> excavation is relatively uniform in elevation. The beginning and <br /> end of all cut areas shall be graded to blend with adjacent <br /> unexcavated slopes. Sharp breaks in gradient between the road <br /> 10 <br />