Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> Project Overview <br /> The goal of this project is to accomplish reclamation of a portion <br /> of the road system at the Coal Basin Mines. Road D, which is <br /> approximately two (2) miles in length will be reclaimed as a result <br /> of this project. See Map 3 , Road Project Map. <br /> This project will accomplish reclamation of the haul road by <br /> removing road drainage culverts, filling the road drainage ditches, <br /> constructing rolled dips and other drainage conveyance structures <br /> on the road remnants, construction of sediment control measures at <br /> various points along the road, and revegetation of the road and <br /> selected slopes adjacent to the road network. <br /> Volumes, distances and areas stated in this document are <br /> estimations only. CONTRACTORS are responsible for verifying all <br /> estimations prior to bid submittal . <br /> Work Tasks <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2 : Culvert Removal <br /> Task 3 : Road Grading <br /> Task 4: Rolled Dip Construction <br /> Task 5: Low Water Crossing Construction <br /> Task 6: Equipment Rental <br /> Task 7: Revegetation <br /> Task 8: Habitat Enhancement <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This Task shall comply with the attached specification 1.0, <br /> Mobilization/Demobilization. <br /> During mobilization, CONTRACTOR shall supply and erect a "road <br /> closed" sign at the bottom of Road D. The sign shall be hung on a <br /> six feet long, four inch by four inch (6' x 4" x 411) wood post <br /> anchored in a hole at least eighteen inches (1811) deep. The sign <br /> 7 <br />