Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> Project Overview <br /> The goal of this project is to accomplish reclamation of a portion of the road system at the Coal <br /> Basin Mines. Approximately seven (7) miles of the road system will be reclaimed during this <br /> project. Roads B, C, and D and the Huntsman Ridge Road will be reclaimed as a result of this <br /> project. See Map 3, Road Project Area Map. <br /> This project will accomplish reclamation of the roads by removing road drainage culverts, filling <br /> road side drainage ditches, earth moving to achieve a specified road cross sectional <br /> configuration, constructing rolled dips and other drainage conveyance structures on the road <br /> remnants, construction of sediment control measures at various points along the roads, and <br /> revegetation of the roads and selected slopes adjacent to the road network. <br /> NOTE THAT VOLUMES, DISTANCES AND AREAS STATED IN THIS DOCUMENT ARE <br /> ESTIMATIONS ONLY. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING ALL <br /> ESTIMATIONS PRIOR TO BID SUBMITTAL. <br /> Work Tasks <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Culvert Removal <br /> Task 3: Road Grading <br /> Task 4: Rolled Dip Construction <br /> Task 5: Low Water Crossing Construction <br /> Task 6: Revegetation <br /> Task 7: Equipment Rental <br /> Task 8: Additional Bid Items <br /> 7 <br />