Laserfiche WebLink
this task is completed and approved by the PROJECT MANAGER. Payment for this task will <br /> be made only for the unit prices shown under Item 7 of the Bid Schedule. <br /> TASK 8 EQUIPMENT RENTAL <br /> Additional areas in and adjacent to the Project Area may require slope reduction, excavation or <br /> erosion control work. A CAT D-4C or equivalent 80 FHP machine with operator, a CAT 416B <br /> Backhoe loader or equivalent 74 fhp machine with operator, and a five (5) cubic yard on/off <br /> highway end dump truck with operator shall be furnished for additional work as needed. <br /> The hours outlined in Item 8 of the Bid Schedule are NOT guaranteed. All work will be <br /> accomplished according to Specification 19.0, Equipment Rental, General Bid Specifications, <br /> 1996. <br /> Measurement and Payment <br /> Payment shall be made as described in General Bid Specifications, 1996, Specification 19.0, <br /> Equipment Rental. Payment will be made at the unit prices established in Item 8 of the Bid <br /> Schedule. The hours outlined in Item 8 of the Bid Schedule are NOT guaranteed. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design specifications. <br /> The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 <br /> P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without <br /> prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br /> inspections with the Project Manager so as not to delay the work. The following items must be <br /> observed and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. Initiation of Corrugated Metal Pipe Excavation; <br /> 2. Completion of excavation side slope construction, prior to scarification; <br /> 3. Initiation of rip rap placement; <br /> 4. Initiation of inlet and outlet excavation; <br /> 5. Completion of inlet and outlet excavation; <br /> 6. Initiation of access road reclamation; <br /> 7. Initiation of willow planting; <br /> 8. Initiation of revegetation. <br /> 16 <br />