Laserfiche WebLink
Coal Basin /2000 Spring Maintenance Project <br /> P KA-O-### <br /> BID SCHEDULE <br /> Quantity* <br /> Item Description (Estimated Unit Price Total Cost <br /> total units) <br /> 1 D6D Dozer/140 fhp equivalent <br /> w/operator including mob/demob 8 $ /hr $ <br /> 1a D6D Dozer/140 fhp equivalent 24 $ /hr $ <br /> w/operator _ <br /> 2 416B backhoe/loader or 62 fhp <br /> equivalent w/operator including 8 $ /hr $ <br /> mob/demob _ <br /> 2a 416B backhoe/loader or 62 fhp <br /> equivalent w/operator 24 $ /hr $ <br /> 3 10 cubic yard on/off highway dump <br /> truck w/operator including 8 $ /hr $ <br /> mob/demob _ <br /> 3a 10 cubic yard on/off highway dump <br /> truck w/operator 8 $ /hr $ <br /> 4 Prefabricated silt fence per lineal foot <br /> installed including mob/demob 100 $ /L.Ft $ <br /> 4a Prefabricated silt fence per lineal foot <br /> installed 100 $ /L.Ft. $ <br /> 5 Straw Bales with rebar per bale <br /> installed including mob/demob 25 $ /bale $ <br /> 5a Straw Bales with rebar per bale 25 $ /bale $ <br /> installed <br /> 6 Rip Rap, per specifications, installed <br /> including mob/demob 25 $ /yd3 $ <br /> 6a Rip Rap, per specifications, installed 25 $ /yd3 $ <br /> GRAND TOTAL <br /> *For bid evaluation only, quantities are NOT guaranteed <br />