Laserfiche WebLink
Coal Basin /2000 Spring Maintenance Project <br /> PKA-0-1079 <br /> BID SCHEDULE <br /> Qty" (Est. <br /> Item Description total units) Unit Price Total Cost <br /> 1 D6D Dozer/140 fhp equivalent w/operator <br /> including mob/demob 8 $ /hr $ <br /> la D6D Dozer/140 fhp equivalent w/operator 24 $ /hr $ <br /> 2 416B backhoe/loader or 62 fhp equivalent <br /> w/operator including mob/demob 8 $ /hr $ <br /> 2a 416B backhoe/loader or 62 fhp equivalent <br /> w/operator 24 $ /hr $ <br /> 3 10 cubic yard on/off highway dump truck <br /> w/operator including mob/demob 8 $ /hr $ <br /> 3a 10 cubic yard on/off highway dump truck <br /> w/operator 8 $ /hr $ <br /> 4 Prefabricated silt fence per lineal foot installed <br /> including mob/demob 100 $ /L.Ft $ <br /> 4a Prefabricated silt fence per lineal foot installed <br /> 100 $ /L.Ft. $ <br /> 5 Straw Bales with rebar per bale installed <br /> including mob/demob 25 $ /bale $ <br /> 5a Straw Bales with rebar per bale installed 25 $ /bale $ <br /> 6 Rip Rap, per specifications, installed including <br /> mob/demob 25 $ /vd3 $ <br /> 6a Rip Rap, per specifications, installed 25 $ /vd3 $ <br /> "For bid evaluation only,quantities are NOT guaranteed <br /> GRAND TOTAL $ <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> Tax I D# <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />