Laserfiche WebLink
MAP 23.2000 2:29PM DIV/MINERALS&GEOLOGY NO.633 P.5i6 <br /> 00/2xi " �VQ i2:. & rm 870 alouauo 9002 <br /> Coal Basin/2000 Spring Maintenance Project <br /> PKA-0-1079 <br /> BID SCHEDULE <br /> City'(Est, <br /> Item Description total units) Unit price Total Cost <br /> 1 060 Dozer/140 MID equivalent w/operator ��o <br /> including mob/demob �- <br /> $-12 <br /> la D60 00zer/140 fhp equivalent w/o'perator 24 $ Sj/U O <br /> 2 416B backhoe/loader or 62 fhp equivalent <br /> Wfoperator including mob/demob <br /> 8 $ r $=2 G1 <br /> 2a 416B backhoe/loader or 62 fhp equivalent <br /> w/operator 24 $ / r <br /> 3 10 cubic yard onloff highway dump truck p <br /> w/operator Including mob/demob �'✓ <br /> 3a 10 cubic yard ohloff highway dump truck <br /> w/operator - a <br /> $ SAS �%hr <br /> 4 Prmfabricateed siltfience per lineal foot installed <br /> including mobldemob 100 $ /L_Ft g QO <br /> 4a Prefabricated silt fence per lineal'Pact installed <br /> 5 Straw Bales with rebar per bale Installed <br /> including mobldemob 25 $ / /bale $-12_ <br /> so . Straw Bales with rebar per bale Installed 25 <br /> 6 Rip Rap, per specifications, Installed Including <br /> mob/demob 25 $ d' $ S_ <br /> Ba Rip Rap, per specifications, installed 2S <br /> 'For bid evoluation only, quantities are NOT guaranteedej <br /> o <br /> •GRAND TOTAL_ $ <br /> 1 <br /> 1 <br /> Contractor _Lzfy_42.. <br /> __,_Oy'Xea w-o"14 ram, �� �rrc Date L�f� <br /> Signature r,0Phone <br /> Address �,.. <br /> Tax 10#S <br /> THIS BID SCHEDULE MUST 13E RETURNED"TH YOUR BID <br /> Page 1 of 1 Page <br /> - 1 <br /> f <br />