My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (276)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (276)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:32:53 AM
Creation date
6/22/2012 10:22:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 2000 General
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O MAR 23 2000_., 2:28PIY 704 lyV MINERALS&GEOLOGYNtY RINDERLE CO NO.633 P.416'm"` <br /> Coal Basin /2000 Spring Maintenance Project <br /> PKMO-1079 <br /> elo SCHEDULE <br /> aty, (Est a <br /> Item Description total unita) Unit Price Total Cost <br /> 1 D6D Dozer/140 fhp equivalentw/operator 8 $ 1U 0Q Ihr S 1,060.00 <br /> including rnobldemob <br /> 12 D6D DozQN140 fhp equivalentW/pperator 24 $! 79;-nQ/hr $-I -AM,00- <br /> 2 416B backhoeilosder or 62 fhp equivalent 9 $ 115.00 /hr $_ 0 <br /> w1operator includino mob/demob <br /> 2a 416D bacichoe/losder or 62 fhp equivalent 24 $ 70-00 ME $ Y 680.00 <br /> w/operator <br /> 3 10 cubic yard oNoff highway dump truck B $ 10 00� $ 880,00 <br /> w/operator including mobldemob ,- <br /> 3a 10 cubic yard onloff highway dump truck e $ 60 00 Ihr $ 480.00 - <br /> wloperator <br /> 4 Prefabricated silt fence per lineal foot.installed 100lL Ft S 7Q0.00 <br /> including mobldemob <br /> 4a Prefabricated silt fence per lineal loot Installed 100 S 3.5 350.OQ <br /> 5 Straw Bales with rebzr per bale installed 25 $ 9,501bWe <br /> Including mob/demob <br /> 5a Straw Bales with rebar per bale installed 25 $ 6.001ba e S 150,0 <br /> 6 Rip Rap, per specifications, installed Including 25 $ 100 Dome. $ 2.500-00 <br /> mobldernob <br /> 6a Rip Rap, per specifics lone, installed 25 $ 55. f c 3 $, 1,375.00 <br /> 'For bid evaluation only,quantities are NOT guaranteed GRAND TOTAL S 12,152.LO <br /> Contractor GARY RI ONST �NC. pats MARCH 20, 2000 <br /> Signature <br /> Phone (970) 434-0510 <br /> Address p 0 BOX 1380 / 542 - 33 ROAD <br /> CLIPTON, CO 81520-1380 TaxlDa 84-1204710 <br /> THIS 810 SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.