Laserfiche WebLink
resources of the area. Failure to conform to these specifications shall result in immediate <br /> suspension of contract. <br /> Because the infested areas are adjacent to public use areas, CONTRACTOR shall post three (3) <br /> signs at the Project Area in locations specified by Project Manager. The signs will be posted five <br /> (5) days in advance of treatment. PROJECT MANAGER will remove the signs following <br /> completion of the Project. The signs shall include the following information: <br /> Notice of intent to apply weed control chemicals; <br /> Warning not to enter area the day of, and one day following the planned application date; <br /> Estimated date of application; <br /> Common name of material'to be applied; <br /> Contractor name and phone number; <br /> "Project administered by Colorado Division of Minerals and Geology. <br /> For more information call (970) 241-0336 or (303) 866-3567." <br /> Additionally, small plastic warning signs shall be posted at three hundred feet (300') intervals <br /> along the roads which traverse the Project Area. These signs shall be posted at the time of <br /> application, and shall be removed no sooner than 24 hours following application. <br /> Other CONTRACTORS may be working in and near the Project Area during performance of this <br /> Project. CONTRACTOR is cautioned to be aware of heavy equipment, and is advised to <br /> coordinate activities with others to the extent that becomes necessary. PROJECT MANAGER <br /> will assist in this regard. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br /> bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs necessary and <br /> incidental to posting and removing signs, and applying the specified herbicide at the required rate <br /> per acre. The lump sum price shall include all equipment, machinery and labor necessary to <br /> complete the Task as described in this specification. Payment will be made only for the price bid <br /> in Item 1 of the Bid Schedule, and as work is completed and approved by PROJECT MANAGER. <br />