My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (276)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (276)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:32:53 AM
Creation date
6/22/2012 10:22:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents ā(IMP)ā 2000 General
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated date of application; <br /> Common name of material to be applied; <br /> Contractor name and phone number, <br /> "Project administered by Colorado Division of Minerals and Geology. <br /> For more information call (970) 241-0336 or (303) 866-3567." <br /> Additionally, small plastic warning signs shall be posted at three hundred feet(300') intervals <br /> along the roads which traverse the Project Area. These signs shall be posted at the time of <br /> application, and shall be removed no sooner than 24 hours following application. ` <br /> Other CONTRACTORS may be working in and near the Project Area during performance of <br /> this Project. CONTRACTOR is cautioned to be aware of heavy equipment, and is advised to <br /> coordinate activities with others to the extent that becomes necessary. PROJECT MANAGER <br /> will assist in this regard. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump <br /> sum bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs necessary <br /> and incidental to posting and removing signs, and applying the specified herbicide at the <br /> required rate per acre. The lump sum price shall include all equipment, machinery and labor <br /> necessary to complete the Task as described in this specification. Payment will be made only <br /> for the price bid in Item 1 of the Bid Schedule, and as work is completed and approved by <br /> PROJECT MANAGER., <br /> i⢠<br /> t <br /> z <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.