Laserfiche WebLink
Road E, the Overland Conveyor Area and a portion of the Old Refuse Area have been <br /> previously reclaimed. A portion of the Sutey Refuse Disposal Area has also been reclaimed. <br /> Access to these areas will need to be accomplished by all terrain vehicle, horseback or foot. <br /> Access by vehicles other than all terrain vehicle will not be permitted at any area which has <br /> been reclaimed. <br /> The Road A Area and the westerly portion of the Sutey Refuse Disposal Area are accessible <br /> truck traffic. <br /> CONTRACTOR shall apply specified chemical herbicide treatments for the purpose of <br /> controlling noxious weed infestations at the Coal Basin Mine. The species of noxious weeds to <br /> be managed at this location include Plumeless thistle (Carduus acanthoides), Canada thistle <br /> (Cirsium arvense) and Houndstongue (Cynoglossum officinale). <br /> CONTRACTOR shall provide all equipment, chemicals and labor necessary to accomplish <br /> application throughout the project area. Tordon will be applied at an application rate of two (2) <br /> quarts per acre. <br /> CONTRACTOR will be responsible for properly securing chemicals until Project completion. i <br /> CONTRACTOR shall apply the herbicides provided at the rate of application above. <br /> Note that a clean water source may not be readily available at the mine site. Potable water may <br /> be available in Redstone. <br /> Treatment using conventional application methods, such as spraying from truck, all terrain <br /> vehicle or back pack mounted equipment is acceptable, given the limitations of access and <br /> reclaimed lands. Aerial application is not permissible. <br /> Application shall NOT occur within six (6) hours of predicted significant rain or snow fall. <br /> Application shall not occur if wind speeds at the application area exceed fifteen (15) miles per <br /> hour. CONTRACTOR must provide a wind speed measurement device, and maintain it in an <br /> operating condition throughout the duration of the Project. <br /> CONTRACTOR shall keep thorough and accurate records throughout the duration of the <br /> project. Records shall indicate material applied, dilution factor, application rate per acre, <br /> ambient air temperature (at 9:00 a.m., noon and 3:00 p.m.) and wind speed (at 9:00 a.m., noon, <br /> 3:00 and 5:00 p.m.). <br /> CONTRACTOR shall conform to all applicable environmental and safety standards given <br /> application methods, duration and products. CONTRACTOR shall not clean and dispose of <br /> unused or remnant materials in a manner which is deemed to be deleterious to environmental <br /> resources of the area. Failure to conform to these specifications shall result in immediate <br /> suspension of contract. <br /> Because the infested areas are adjacent to public use areas, CONTRACTOR shall post three <br /> (3) signs at the Project Area in locations specified by Project Manager. The signs will be <br /> posted five (5) days in advance of treatment. PROJECT MANAGER will remove the signs ' <br /> following completion of the Project. The signs shall include the following information: <br /> Notice of intent to apply weed control chemicals; <br /> Warning not to enter area one day prior to, and one day after planned application date; <br /> 3 <br />