Laserfiche WebLink
GENERAL CONDITIONS OF THE CONTRACT <br /> Article 1. DEFINITIONS <br /> A. Contract Documents. The Contract Documents consist of: <br /> (a) Agreement and Bid Schedule; <br /> (b) Performance and Payment Bonds; <br /> (c) Liability,Automobile and Workmen's Compensation Certificates of Insurance; <br /> (e) Notice to Proceed; <br /> (f) General Conditions of the Contract; <br /> (g) Detailed Special Conditions, including all amendments issued prior to the opening of the bids and <br /> including any applicable Standard Work Specifications; <br /> (h) Maps and drawings, including all amendments issued prior to the opening of the bids; <br /> (i) Final inspection and certificate of completion; <br /> 0) Notice of Contractor's Settlement, and <br /> (k) List of Equipment Offered. <br /> B. Procedural Documents.The Procedural Documents consist of: <br /> (a) Advertisement for Bids; <br /> (b) Bid form; <br /> (c) Bid Bond; <br /> (d) Notice of Award; <br /> (e) MBE/WBE Forms;and <br /> (f) AML Contractor Ownership and Control Information Package(AVS); <br /> (g) Three-Way Agreement for Reclamation Activities, if required <br /> C. Correlation and Intent of the Documents <br /> The Contract Documents are complementary;what is called for by any one document shall be as binding as if called for by <br /> all. The intention of the documents is to include all labor and materials,equipment and transportation necessary for the <br /> proper execution of the work. Materials or work described in words which have a well-known technical or trade meaning <br /> shall be held to refer to such recognized standards. <br /> In case of a difference between the contract documents, precedence shall be given in the following respective order: <br /> Agreement,Bid Schedule,Special Conditions,Standard Work Specifications,Maps,Drawings,and General Conditions. <br /> Amendments shall take precedence in the area of the bid document which they modify or clarify. In the case of any such <br /> difference, the matter shall be promptly brought to the attention of the Principle Representative who will make a <br /> determination in writing. <br /> D. Words and Terms Used <br /> PRINCIPLE REPRESENTATIVE OR STATE - The term Principle Representative means the Director of the State of <br /> Colorado Division of Minerals and Geology(DMG)or his designee. The Colorado Division of Minerals and Geology is <br /> located at 1313 Sherman Street, Room 215, Denver,Colorado,80203,telephone(303)866-3567. <br /> PROJECT MANAGER - The term Project Manager means the Division of Minerals and Geology employee or <br /> representative responsible for day to day observation of work at the project site,and general contract administration for the <br /> DMG. <br /> CONTRACTOR-The term Contractor means the sole proprietorship,partnership,or corporation entering into a Contract <br /> with the State of Colorado. <br /> AGREEMENT-The word Agreement means the written Agreement entered into by the State of Colorado acting by and <br /> through the Principal Representative and the Contractor for the performance of the work and payment for the work. <br /> WORK-The word Work means material and/or labor. <br /> SUBCONTRACTOR-A Subcontractor is a sole proprietorship,partnership or corporation which has a contract with the <br /> Contractor for the performance of labor at the site of the work regardless of whether supplying of material is part of such <br /> contract, but without contractual relationship to the Principle Representative. <br /> DRAWINGS-The word Drawings shall mean all drawings in the Special Conditions. <br /> COLORADO LABOR-The term Colorado Labor shall be defined as provided in Title 8-17-101, et seq. CRS 1973, as <br /> amended. <br /> Colorado Division of Minerals and Geology GENERAL BID SPECIFICATIONS <br /> June 1, 2002 Page 1 <br />