The project cost(bid at$234,000) exceeded the estimated$160,457.77 in the Grant <br /> application. The Division has decided to fund the balance of the project above the cost <br /> projected in the Grant. <br /> A public tour of the site(Objective 2)was conducted in early August 2004. Members of <br /> the public and of the Forest Service toured portions of the site, and viewed the mine <br /> bench outslopes. Some members of the public expressed an interest in the slope <br /> stabilization project. These individuals will be invited to view construction as it takes in <br /> late September and early October. <br /> ., . . . <br /> "4 <br /> a - <br /> � .a4 <br /> -:a <br /> Mine 3 South Outslope. To be revegetated fall, 2004. <br />