My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-03_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
2002-05-03_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:38 PM
Creation date
6/21/2012 1:56:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/3/2002
Doc Name
Bid Documents (IMP) 2002 Weed Bid
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: April 30, 2002 <br />TO: Matt Johnson, Roaring Fork Vegetation Management <br />FROM: Steve Renner, Division of Minerals and Geology <br />RE: Purchase Order Quote; Coal Basin 2002 Weed Control Project <br />Enclosed is a description and Purchase Order Quotation Form for the Coal Basin Weed Control <br />Project. <br />Site Showing <br />There will not be a mandatory site showing. <br />Quote Submission and Evaluations <br />The Purchase Order Quotation and list of equipment offered forms must be submitted by 2:30 <br />p.m. on May 8, 2002 by FAX, mail or in person to: <br />Telephone Bids will NOT be accepted. <br />Steve Renner, Division of Minerals and Geology <br />101 South 3rd Street, Room 301 <br />Grand Junction, Colorado 81501 <br />FAX: 970 - 241 -1516 <br />Award <br />The attached Quotation and List of Equipment Offered forms must be submitted. Award will be <br />made if the amount bid is within the Project budget estimate, and if the equipment and <br />personnel offered are deemed sufficient by the Division to accomplish the Project within the <br />specified time of completion. <br />List of Equipment Offered. The List of Equipment Offered form must be returned with the Bid <br />Schedule. All equipment to be used on the project must be listed. The number of laborers, <br />including equipment operators, who will be made available to perform the specified work for the <br />purpose of completing the Project within the specified completion time, must be included on the <br />List. <br />The CONTRACTOR must own, have a current lease for the equipment intended to be used to <br />perform the work, or must furnish a statement of arrangements to rent, or otherwise procure, <br />adequate equipment to perform the work. Inclusion of a piece of equipment and inclusion of a <br />work crew size on the List of Equipment Offered represents a commitment to devote that piece <br />of equipment and that number of laborers to the project work for the entire duration of the <br />project. If several contractors propose to join together to perform the work under this purchase <br />order contract, equipment owned or controlled by each should be listed and the owner <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.