Laserfiche WebLink
-51- <br /> XVI. Backfi11ing and Grading - Rules 2.05.3(9) , 2 OS a(2) (c) , 4.09 <br /> and 4 14 <br /> The backfilling and grading plan in Section 5-E of Volume 7 of the <br /> application has been reviewed by the Division for compliance. <br /> The applicant proposes to backfill the mine benches by breaking the <br /> concrete foundations of the surface facilities, placing this material <br /> against the face-ups, then subsequently covering the broken concrete. <br /> Insufficient information is contained 4ithin the application to judge <br /> stability of the proposed final reclamation backfilling and grading plan <br /> for the five mine portal benches. In accordance with Rules 4. 14 and <br /> 4.27, the applicant is required to demonstrate that the proposed regraded <br /> configuration will achieve a minimum static slope safety factor of 1 .3. <br /> Because the five mine portal benches now exist in their proposed maximum <br /> state of disturbance and reclamation will not occur until cessation of <br /> mining (approximately 40 years in the future) , this topic is amenaole to <br /> stipulation. The Division finds that the following stipulation is <br /> necessary for a finding of compliance with the backfill and grading <br /> requirements of Rules 2.05.3(3) , 2.U5.4(2) (c) and 4. 14. <br /> Stipulation No. 7 • <br /> THE DIVISION DIRECTS THE PERMITTEE TO COMPLETE A THOROUGH <br /> GEOTECHNICAL INVESTIGATION AND STABILITY ANALYSIS OF THE PROPOSED <br /> BACKFILLED CONFIGURATIONS FOR THE FIVE PORTAL BENCHES AT THE COAL <br /> BASIN MINES. THE PURPOSE OF THIS PROJECT SHALL BE TO DEVELOP <br /> SPECIFIC BACKFILLING, GRADING, DRAINAGE, AND RECLAMATION PROCEDURES <br /> TU ASSURE OPTIMUM STABILITY OF THE FINAL RECLAIMED PORTAL BENCHES. <br /> FURTHER, THE PERMITTEE SHALL PREPARE A DETAILED MATERIAL BALANCE, <br /> DESIGNATING THE PROPOSED SOURCE OF MATERIALS TO BE UTILIZED IN SO <br /> COMPLETING THE BACKFILLING AND GRADING OF THE MINE PORTAL AREAS. v v A <br /> THE PERMITTEE SHALL SUBMIT THE REPORT OF THE GEOTECHNICAL W <br /> INVESTIGATION AND STABILITY ANALYSIS, THE DETAILED MATER <br /> BALANCE, AND A DETAILED PORTAL BENCH RECLAMATION P 0 THE <br /> DIVISION FOR REVIEW PRIOR TO OECEr�16ER 31 198a <br /> ThP application <br /> - , <br /> pplication includes the construction of a rock tunnel to be uisOpe <br /> to <br /> haul coal from the No. 1 and No. 2 mines to the base of the seep s <br /> portion of the Basin' s road system. This tunnel will allow discontinued <br /> hauling of coal oy truck along the upper road system, which will greatly <br /> decrease impacts upon the Coal Basin environment and sianificantly reduce <br /> haZara exposure for the truck drivers and otner mine oerscnnel . The rock <br /> tunnel ano its associated 320,000 cubic yard waste pile was rQviel;red and <br /> aooroved -as -a technical revision during i979 and 19B0. The approval of <br /> .he tunnel and its associated underground development waste pile <br />