My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (262)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (262)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:08:18 AM
Creation date
6/21/2012 10:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Backfilling and Grading Plan for Preparation Plant Area
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-50- <br /> Two general types of underground mining methods are utilized to produce <br /> coal at Coal Basin. They are the room and pillar and the longwall <br /> methods. All coal is transported from the mining section to the surface <br /> via belt conveyors and placed in temporary storage bins of up to 1 ,000 <br /> tons capacity near the mine portals. Hen and materials are transported <br /> into and out of the mines via slope hoists and/or self-propelled mantrip <br /> vehicles. Each mine is ventilated with a separate split of air. Roof <br /> control is accomplished principally with roof bolts; however, other <br /> means, including posts, cribs and arches, are used. In pillar sections <br /> and longwall panels, the roof is allowed to cave after mining. <br /> The run-of-mine coal is transported from the mine portal bins to the <br /> preparation plant in off-highway diesel powered trucks. Each of the <br /> mines is located approximately 4 miles from the preparation plant. At <br /> the preparation plant, rock and refuse materials are removed from the <br /> coal by gravity separation methods and froth flotation. After cleaning, <br /> the coal is thermally dried and placed in clean coal storage bins. From <br /> there, it is transported approximately 22 miles to the unit train loadout <br /> station at Carbondale by semi-trucks. Rock and refuse materials removed <br /> from the coal at the preparation plant is presently placed in the refuse <br /> pile situated in Coal Basin near the preparation plant. Coal refuse will <br /> be disposed of in a small canyon approximately l 1/2 miles southwest of <br /> the preparations plant following base preparations in the summer of 1983. <br /> Mid-Continent plans to mine between 800,000 and 1 ,300,000 tons of coal <br /> per year from its Coal Basin Mines for the next 40 years. It is <br /> estimated -ghat there are at least 40,000,000 tons of recoverable coal in <br /> the two minable seams within the Federal coal leases and privately owned <br /> lands availaole to the company in the mine plan area. Mining operations <br /> will be conducted in the two commerically minable coal seams of the <br /> Mesaverde Group located in Coal Basin. These seams are the Coal Basin <br /> seam, or "B" bed, and the Uutch Creek seam, or "Middle" bed. The <br /> "Middle" bed overlies the "B" bed stratigraphically by about 450 feet. <br /> There are no other known commercially minable coal seams in Coal Basin. <br /> The coal seams outcrop along the sides of the Basin at elevations ranging <br /> from approximately 9,500 feet to 10,700 feet. Both coal seams are <br /> believed to be continuous, except for some faulting, within the mine plan <br /> area. Because of intense faulting, thickness of the coal beds, igneous <br /> intrusives and the extreme depth of cover, portions of the coal resources <br /> within the mine plan are are not commercially minaole at this time. The <br /> "3" bed overlies another coal seam, known as the "A" seam, that is not <br /> commercially minable because or its thinness ano close proximity to the <br /> "3" bed. Consequently, it is not considered to be part of the minaole <br /> coal reserve. <br /> The proposed operation is in como-liance with the requirements of this <br /> Section. <br /> axolosives - Mules 2.05.3(5) and d.08 <br /> ivo surface busting is anticipateo at th15 Operdtion. The r?C,U1reTents <br /> of :nis section cc nct apply. Therefore, the prcaosed operation is in <br /> c;moi iance .vi�;n this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.