My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (262)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (262)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:08:18 AM
Creation date
6/21/2012 10:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Backfilling and Grading Plan for Preparation Plant Area
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Soto <br /> DEPARTMENT OF NATURAL RESOURCES <br /> * David H.Getches,Executive Director <br /> MINED LAND RECLAMATION DIVISION <br /> f 876 D"ID C.SHELTON, Director <br /> Richard D.Lamm <br /> Governor <br /> February 17, 1984 <br /> Mr. Doug Bowman <br /> Mid-Continent Resources, Inc. <br /> P.O. Box 158 <br /> Carbondale, Colorado 81623 <br /> Re: Quantification of Sediment Generated by Road System <br /> File No. C-017-81 <br /> Dear Mr. Bowman: <br /> I have completed an extensive analysis of the water quality data contained in <br /> the Coal Basin Mines permit application and in your letter of December 23, <br /> 1983 in order to quantify the road system sediment yield. In your letter, you <br /> came up with a sediment yield estimate of approximately 3 tons/acre/year. <br /> Using the data from both sources, I calculated several estimates of the road <br /> system sediment yield that varied between 1 .4 tons/acre/year to 22.8 <br /> tons/acre/year. At that point, it became evident to me that the actual <br /> contribution of sediment from the road system cannot be quantified without <br /> installing a more sophisticated monitoring system. <br /> In order to determine whether a road drainage monitoring system is warranted, <br /> I conducted a t-test on the Total Suspended Solids (TSS) data from all 10 <br /> stream monitoring sites. This analysis shows whether there are any <br /> statistical differences in TSS levels between the stations and between <br /> undisturbed and disturbed drainages. No significant differences were found at <br /> the 1% level . Therefore, I do not feel that any additional monitoring is <br /> necessary at present. <br /> During my next inspection, I will discuss my methods of data analysis in more <br /> detail . If you have any questions in the interim, please don't hesitate to <br /> call me. <br /> 4incerely <br /> m Herron <br /> Reclamation Specialist <br /> JH/mt <br /> Doc. No. 9473 <br /> 423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303)866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.