Laserfiche WebLink
App. II-13-4 <br /> 7 / 11 / 85 Muck Pond. <br /> 7 / 11 / 85 Sediment Pond Cleaning on Sutey Waste Pile. <br /> 7 / 11 / 85 Enlarged Culvert - No. 5 Mine Road. <br /> 7 / 24/ 85 Rill and Gully Repair Program. <br /> 10/ 16/ 85 New Powerline, Fan Move. <br /> 11 / 14 / 85 Power Poles, Tree Removal. <br /> MR-1986 <br /> 2 / 20/ 86 MR-1. Decrease of Berm Width for Sutey Topsoil Area.. <br /> 6/ 6/ 86 MR-2. Inspection Frequency Reduction. <br /> 7 / 2 / 86 MR-3. Relocation of Powerline. <br /> 12 / 7 / 86 MR-4. Satisfaction of Stip. No. 1 to MR-1. <br /> MR-1987 <br /> 7 / 27 / 87 MR-5. Rock Tunnel Pond A Spillway. <br /> 10 / 15/ 87 MR-6. Temporary Seed Mix. <br /> 10/26 / 87 MR-7. Sutey Conveyor Area Expansion. <br /> MR-1988 <br /> 3/ 15/ 88 MR-8. Placement of Pond Cleanings on Rock Tunnel Waste <br /> Area. <br /> 3/23 / 88 MR-9. Strip & Stockpile Topsoil for Sutey Expansion. <br /> 6/ 1 / 88 MR-10. Ditch Design. Sutey Conveyor. <br /> 6/ 30 / 88 MR-11. Winter Storage - Non-Coal Waste. <br /> 4 <br />