Laserfiche WebLink
App. II-13-4 <br /> MINOR REVISIONS <br /> MR-1983 <br /> 4/ 5/ 83 No. 1 Mine Coal Stockpile Expansion. <br /> 9 / 1 / 83 Exploration of Roads for the Conveyor Corridor. <br /> 9 /23 / 83 Change Subsidence Monitoring System. <br /> MR-1984 <br /> 1 / 18 / 84 Variance - 100' Buffer. <br /> 4/ 13 / 84 Stockpile Coal -Tunnel Area. <br /> 6/ 6/ 84 First Phase - Sutey Conveyor System. <br /> Summer, 1984. Arctic Circle Sediment Pond.. <br /> 9/ 10/ 84 Revegetation Seed Mix - Conveyor Corridor. <br /> 9 / 11 / 84 Upgrade Light Use Road. <br /> 9/ 11 / 84 Modification of Ground Water Monitoring. <br /> 9/ 18/ 84 Relocation of Powerline at Preparation Plant. <br /> 10/ 3 / 84 Coal Storage on Mine No. 2 Bin Pad. <br /> 11 / 14/84 Trommel Waste at No. 1 Mine Strip Pit. <br /> 12 / 3/ 84 Coagulant - Sediment Ponds. <br /> 12/ 7 / 84 New Seed Mix for Sutey Area. <br /> MR-1985 <br /> 3/ 19/ 85 Powerline Relocation. <br /> 4/ 5/ 85 Updated Maps of Disturbed Areas. <br /> 7 / 11 / 85 Rock Tunnel Sealing Plan. Stip. No. 4. <br /> 3 <br />