Laserfiche WebLink
Diane Delaney - 2 - July 22, 1988 <br /> A more general reclamation plan has been accepted for the haul roads. <br /> Specifically, the Division approved a controlled sloughing of the road system <br /> to allow for reclamation. However, a specific area of concerns needs to be <br /> addressed. This is the slide at the No. 3 Mine Road above the Rock Tunnel <br /> portal . If Haul Roads No. 3 and No. 5 are to remain in as Forest Service <br /> access, it must be demonstrated that long-term stability of the slide can be <br /> achieved. <br /> These issues need to be addressed by Mid-Continent prior to permit renewal or <br /> if Mid-Continent so wishes stipulations to the permit could be attached within <br /> the Findings Document. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> 6amj <br /> Candace M. Thompson <br /> Hydrologist <br /> CMT/eas <br /> 8977F <br />