My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (260)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (260)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:05:27 AM
Creation date
6/21/2012 10:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Transfer of Permit SO1
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT RESOURCES, INC. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTI NENT RESOURCES,INC TELEPHONE <br /> 625 PLAINFIELD ROAD-SUITE 220 (303)963-2581 <br /> W ILLOWBROO K, ILLINOIS 60521 January 20 , 1986 910 929 6TWX <br /> 894 <br /> TLX <br /> aft ow aft. 45-0724 <br /> WILD <br /> JAN z 3 1966 <br /> Ms. Candace Thompson <br /> Mined Land Reclamation Division <.;�.;e �'�, s� <br /> 423 Centennial Bldg. MM11GEU LAND <br /> 1313 Sherman St. cojo. Dept. Ot Nat�iral Reno fCc% <br /> Denver , Colorado 80203 <br /> Re: Hydrologic Material - Midterm Review <br /> Dear Candace, <br /> Enclosed is our first draft of the hydrologic <br /> data; please review and let me know how you would <br /> prefer it displayed. <br /> I took the current perimeters and worked <br /> backwards in listing them; that is in the past , <br /> some years other perimeters were taken. I can send <br /> you all the raw data that you don' t have; or you <br /> can look at it here on your next trip. I feel that <br /> the perimeters listed show a good representation <br /> of all that were taken in the past. <br /> My first "gut" feeling on the monitoring <br /> schedule would be to stay on quarterly for Sutey <br /> and put everything else on an annual or semi-annual <br /> basis. <br /> Call me if you have any questions. <br /> Sincerely, <br /> Environmental Coordinator <br /> DWBowman:ms <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.