My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (260)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (260)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:05:27 AM
Creation date
6/21/2012 10:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Transfer of Permit SO1
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-8- <br /> Revegetation Costs <br /> No. 1 Mine and Roads <br /> 34 acres x $2,500/acre = $ 85,000.00 <br /> No. 2 Mine and Roads <br /> 13 acres x $2,500/acre = $ 32,500.00 <br /> No. 3 Mine and Roads <br /> 40.1 acres x $2,500/acre = $100,250.00 <br /> No. 4 Mine and Roads <br /> 35.4 acres x $2,500/acre = $ 88,500.00 <br /> No. 5 Mine and Roads <br /> 44.8 acres x $2,500/acre = $112,000.00 <br /> Tunnel Area <br /> 30.5 acres x $2,500/acre = $ 76,250.00 <br /> Prep Plant <br /> 40 acres x $2,500/acre = $100,000.00 <br /> Miscellaneous Roads <br /> 26 acres x $2,500/acre = $ 65,000.00 <br /> IV. Other Areas <br /> Calculations for the loadout area are based on total reclamation. It was felt <br /> that worst cause must be applied, as there is no certainty that a business can <br /> be established on the site. Costs for Sutey and the Tunnel Conveyor were <br /> taken directly from calculations performed last year. <br /> A. Loadout. <br /> Facilities demolition $326,394.50 <br /> Rip Pavement 7,760.00 <br /> Well Sealing 750.00 <br /> Grading 3,404.00 <br /> Revegetation 4,000.00 <br /> B. Sutey Refuse area $205,252.00 <br /> C. Tunnel to Wash Plant Conveyor $307,138.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.