My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (259)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (259)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:02:34 AM
Creation date
6/21/2012 10:22:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Transfer of Permit SO1
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Nipple up 13 3/8" X 3000# W.P. blow out preventer <br /> (BOP) and test BOP and casing to 500 psig for 30 <br /> minutes. Install Grant Rotating Head on top of <br /> BOP with blow line for air drilling to shale pit. <br /> 8. Rig up adequate air equipment to drill 12 1/4" <br /> hole with air or air-mist to 2400'+. <br /> 4 - Compressors <br /> 1 - Booster <br /> 1 - Mist Pump <br /> 9. Drill with air or air-mist with 12 1/4" stabilized <br /> hole to top of the "GOB" zone or just below the <br /> Dutch Creek Coal seam. Attempt not to drill into <br /> the fractured zone. Check hole deviation every <br /> 100'/300' as required keeping hole deviation less <br /> than 30 from vertical. <br /> 10. Circulate hole with mud. <br /> 11. Run and set 2400'+ of 9 5/8" 36#/ft, K-55 ST&C <br /> casing. Cement 9 5/8" with adequate cement to <br /> circulate cement to 1500' above the casing shoe. <br /> Set 9 5/8" slips in well head. Test 9 5/8" casing <br /> to 1000 psig for 30 minutes. <br /> 12. Nipple up to drill out of the 9 5/8" casing with <br /> air-mist using 2/3% KCL water and foamer. Drill <br /> 8 3/4" hole into the "GOB" area in 15'/30' incre- <br /> ments testing for gas flow as the hole is drilled. <br /> Continuously monitor methane content of air-mist <br /> at all times. Drill to approximately 2750'+. Do <br /> not drill into mined area. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.