Laserfiche WebLink
personnel. <br /> Compliance Testing, Preparation of DMRs <br /> The Environmental Department is responsible for all sampling, <br /> preparation and submission of reports required by the Mined Land <br /> Reclamation Division and the Colorado Department of Health. <br /> Maintenance Procedures 016 <br /> Technical Revision #11 added the following language to the approved <br /> permit: <br /> " The ponds at Discharge Point 016 are cleaned, <br /> as necessary, when the sediment load reaches <br /> 60% of capacity. Inflow to the ponds is <br /> monitored for flow (sampling weekly) and TSS <br /> (sampling twice monthly) in order to calculate <br /> sediment load to determine when cleaning is <br /> necessary (See Appendix II-B-7 Att. 4) . Access <br /> is maintained to the ponds at Discharge Point <br /> 016 to allow cleaning during winter. " <br /> Mid-Continent requests a slight language change to clarify that the <br /> monitoring of inflow will be done at those times when the ponds are <br /> receiving mine discharge for a prolonged period of time. Cleaning <br /> will be done as necessary, and winter access will be maintained. <br /> At some future time, we may request permission to discontinue <br /> maintenance of winter access to 016, but that would be the subject <br /> of a specific amendment request. <br /> " The ponds at Discharge Point 016 are cleaned, <br /> as necessary, when the sediment load reaches <br /> 60% of capacity. If mine drainage is routed <br /> to the ponds for a prolonged period of time, <br /> then inflow to the ponds will be monitored for <br /> flow (sampling weekly) and TSS (sampling twice <br /> monthly) in order to calculate sediment load <br /> to determine when cleaning is necessary (See <br /> Appendix II-B-7 Att. 4) . Access is maintained <br /> to the ponds at Discharge Point 016 to allow <br /> cleaning during winter. " <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Res. <br /> 8 <br />