Laserfiche WebLink
including our present cash flow situation. We have been making <br /> substantial changes in our mining operation which have caused us <br /> to incur significant costs while curtailing our production. We <br /> don't have the financial capability, at present, of completing <br /> installation of the plant. <br /> Further Progress <br /> Mid-Continent intends to provide additional treatment capabilities <br /> for the mine drainage. We have expended significant sums of money, <br /> time and effort to do so. The recent problems with H2O have been <br /> a setback. <br /> We feel that further analysis of the situation and possible <br /> alternatives to the plant as designed last fall is necessary. <br /> For one thing, the excellent performance of the ponds with the <br /> addition of guar gum, suggests to us that some of our assumptions <br /> of last summer concerning treatment needs should be re-examined. <br /> It is our intention to proceed diligently with an analysis of <br /> feasible options for (a) possible treatment method(s) other than <br /> the plant; (b) phase-in of components (of the plant) ; (c) possible <br /> re-design or down-sizing of the plant. <br /> The infra-structure established for the plant and which is now in <br /> place (including principally the 8" pipeline from the tunnel portal <br /> down to the plant area) does present us with options not previously <br /> available. Further consideration will be given to possible <br /> interim/near term uses which could be made of this infrastructure, <br /> as well as long term planning. <br /> At present there are no treatment methods approved for mine <br /> drainage other than the 016 ponds and the plant. Planning of <br /> additional or alternate methods will be done in consultation with <br /> MLRD and the Department of Health. Permit amendment(s) will be <br /> sought as necessary. <br /> Mid-Continent will report to MLRD and the Department of Health as <br /> to our revised plan of action, and we will submit a timetable for <br /> implementing the plan. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources <br /> cc: Robert Shukle <br /> Chief, Enforcement & Permitting <br /> Colorado Department of Health <br />