Laserfiche WebLink
Preparation Plant Area <br /> Area --- 35 Acres (See Post Mining Land Use) <br /> Structures Removal - 120,000 <br /> Rough and Smooth Grading <br /> and Scarifying 17,500 <br /> Amendments, Fertilizer, <br /> Planting & Mulching 28 , 000 <br /> Roads --- 5. 0 Acres 6 , 500 <br /> 171, 500 <br /> Carbondale Train Loadout (See Post Mining Land Use) <br /> Area '--- 5 Acres <br /> Structures Removal 30,000 <br /> • Rough and Smooth Grading <br /> and Scarifying 2,500 <br /> Amendments, fertilizer, <br /> Planting and Mulching 4 , 000 <br /> 51, 500 <br /> Roads Misc. - 5 days <br /> Area ---26 Acres - <br /> Structures Removal 5,000 <br /> Rough and Smooth Grading <br /> and Scarifying 13, 000 <br /> Amendments, Fertilizer, <br /> Planting and Mulching 20 , 800 <br /> 38 , 800 <br /> Power Lines Misc. (No revegetation required) <br /> Structures Removal (10 days) 20, 000 <br /> TOTALS <br /> No. l Mine $148 ,200 <br /> No. 2 Mine 76 , 900 <br /> No. 3 Mine 152,130 <br /> No. 4 Mine 86,020 <br /> No. 5 Mine 94 ,240 <br /> Tunnel 133,650 <br /> Preparation Plant 171, 500 <br /> Train Loadout 51,500 <br /> Road, Misc. 38, 800 <br /> Power Lines, Misc. 20 , 000 <br /> TOTAL $972 ,940 <br /> (See 1"=2,000 ' Post-mining Land Use Map Exhibit VI-D-1) <br /> 19 <br />