My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (239)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (239)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:24:14 AM
Creation date
6/20/2012 11:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1982 Technical Revisions Rock Tunnel Trash Pile
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division assumes that a D9U Caterpillar dozer will be used to backfill and <br /> rough grade the portal areas: The average push distance is 150 feet, thus the <br /> unadjusted production rate for a D9U dozer is 1,000 LCY per hour. The following <br /> are the factors which will affect the production (pgs. 42, 43, 500, C11) : <br /> Condition Factor <br /> Average Operator 0.75 <br /> Rock Material 0.70 <br /> 50 Minutes working time per Hour 0.84 <br /> Grade Factor (38%) 0.26 <br /> Altitude Deration 0.94 <br /> Overall Factor 0.11 <br /> with a production factor of 0.11, a D9U can move 110 LCY/hr. Therefore, 244 <br /> hours would be required to backfill the Mine No. 1 bench. <br /> The monthly iental rate for a D9U dozer (pg. 9-92, BB) is $14,200.00, with an hourly <br /> operating cost of $38.25. Adjusting for the 10% location factor, the monthly <br /> rental cost is $15,620.00. Assuming 22 days per month and 8 hours per day, the <br /> hourly rental rate would be $88.75. Adding the estimated operating cost of $38.25, <br /> the hourly rate would be $127.00. Based on this rental rate, backfilling and <br /> rough grading the Mine No. 1 mine bench would have• the following cost breakdown: <br /> 1 - D9U dozer: ' 244 hours @ $127.001hr. _ $30,988.00 <br /> 1 - Operator: 244 hours @ $ 15.00/hr. _ $ 3,660.00 <br /> TOTAL COST. $34,648.00 <br /> The Mine No. 1 storage bench is 2.65 acres and must be backfilled to an average <br /> depth of 14.75 feet (see cross-section) . Therefore, 63,061 yd3 of material would <br /> have ,to be moved_ All production factors except slope would be the same as previously <br /> noted. With a grade factor of 14%, the overall production factor would be 0.33. <br /> The average push distance is 150 feet, thus the overall production rate for a <br /> D9U would be 330 LCY/hr. Based on this production rate, it would take 291 hours <br /> to complete this backfilling operation at the following cost: <br /> 1 - D9U dozer: 191 hours @ $127.00/hr. _ $24,257.00 <br /> 1 - Operator: 191 hours @ $ 15.00/hr. _ $ 2,865.00 <br /> TOTAL COST: $27,122.00 <br /> 19-2 _-- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.