Laserfiche WebLink
Mid-Continent Resources, Inc. <br /> Revegetation at Coal Basin Mines 1994 <br /> Request for Proposal <br /> Scope of Work <br /> In September or October of 1994 , approximately 90.4 acres of roads , <br /> portal areas and refuse piles will need to be reseeded, fertilized <br /> and mulched. All areas, located near Redstone, Colorado, are <br /> outlined below: <br /> Area Description Acres-Mild Slope Acres-Steep Slope Total Acres <br /> Road G 15 .8 4. 6 20 .4 <br /> Road F 12 . 3 2 . 6 14 . 9 <br /> Road E 5 .7 1 . 4 7 . 1 <br /> Road C 10 . 9 4. 7 15 . 6 <br /> Sutey Refuse 15 .0 -2 . 0 17 . 0 <br /> Mine #3 5.0 2 . 7 7 . 7 <br /> Mine #4 4 .0 3. 7 3. 7 <br /> ----------------------------------------------------------------- <br /> Totals: 68 . 7 acres 21 . 7 acres 90 .4 acres <br /> The areas of steep slope are generally narrow widths along the cut <br /> and fill slopes of the roads and some backfilled areas of the <br /> portals. The portal backfill areas may be 2.OH: 1 .OV. These areas <br /> could be broadcast seeded and mulched or hydro-seeded and mulched . <br /> If hydroseeding and mulching is recommended, please call me. <br /> The areas of mild slope are generally less than 10% slope and <br /> should be drill-seeded and crimp-mulched. <br /> Approximately 4000 lbs/acre of weed free straw, hay or other mulch <br /> fiber should be placed per acre. Also, 30 lbs of 40-40-0 fertilizer <br /> per acre is needed. <br />