My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (254)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (254)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:55:34 AM
Creation date
6/20/2012 10:06:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1994 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Continent Resources, Inc. <br /> Topsoil Replacement at Sutey Refuse Pile <br /> Request for Proposal <br /> Scone of Work <br /> The enclosed map at a scale of 1 "=100 ' shows the current <br /> configuration of the Sutey coal refuse pile. The pile is located <br /> near Redstone, Colorado. The area highlighted in yellow shows the <br /> area where topsoil must be spread. North and east slopes should <br /> receive 12 to 18 inches , west slopes should get 18 to 24 inches and <br /> south slopes should get 24 to 30 inches . <br /> Also shown are two topsoil stockpile areas which are the sole <br /> source of the soil . Assuming an average depth of 20 inches over an <br /> area of 13. 1 acres, this results in a volume of approximately <br /> 35,000 cubic yards. <br /> A scraper is the most efficient machine to perform the work . Since <br /> a scraper initially removed the topsoil from the area and built the <br /> two stockpiles , little dozer help should be needed ; nevertheless , <br /> any loading assistance will be provided by Mid-Contnent . <br /> Approximate haul parameters: <br /> - average haul distance is approximately 560 feet <br /> - an average loaded grade of 9 . 5%. <br /> Other items : <br /> - soil should be spread as evenly as possible to minimize final <br /> grading work by dozer (not part of this work ) . <br /> - spreading operation should minimize compaction, where possible. <br /> The bid should be lump sum and bidder should provide all labor , <br /> materials, fuel and equipment needed for the job . Bidder must <br /> provide general liability insurance for $1 ,000 ,000 . All of the <br /> successful bidder ' s personnel to be used on the site must have <br /> current worker ' s compensation. The work will take place in June of <br /> 1994. Please reply within 7 days . <br />
The URL can be used to link to this page
Your browser does not support the video tag.