My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (253)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (253)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:53:38 AM
Creation date
6/20/2012 10:05:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1994 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sENr BY: 12-11-94 : 8:37PNI 0 S Dl-i 50. 76626Uy:g 2/ 1 <br /> .m,L^ n IIIYtN I L'.1 l:HttK COST ESTIMATE <br /> COMPLETED ON 12JI2194 08:28:38 BY HAL PRANGER <br /> ASSUMPTZNS <br /> UNIT ! DESCRIPTIONS I <br /> ITEM COST I(NITS I (FROM MEANS 52ND EDITION,1904.TOTAL ONLY) I <br /> ---_------- I <br /> A.DOZER EXCAVATION-300 HP $1.58 YARD«3 I p.AA.ITEM 022 242 S220 <br /> 8.MACHINE PLACED RIPRAP $30.80 YARD-3 I p.60.ITEM 022 7120200' (EXCLUDING MATERIAL COST) I <br /> C.FRONT ENO LOADER_2-1/4 C.V. 00.68 YARD-3 J p 43,ITEM 022 238 1800 I <br /> D ADDITIONAL FRONT END LOADER $0.13 YARD"3 I P,43,ITEM 022 238 0020 I <br /> E.MOBILIZATION COST.FRONT END S228.50 I p.45.ITEM 022 270 1300 I <br /> F.12 C.Y DUMP TRUCK S5.88 YARD'3 I p,43,ITEM 022 268 OW <br /> I <br /> »»» T(J I AL COST. <br /> ------ ---------------- I <br /> RECLAMATION AREAS AND ITEMS I ASSUMPTIONS/COMMENTS <br /> I I EXCAVATION I LENGTH WIDTH DEPTH VOLUME <br /> COST T I (h) (R) 01) (yd-3) I I <br /> I -........-- I — —.•»— I i s'BOTTOM WIDTH CHANNEL ) <br /> I 315 50 I DOWNSTREAM TOP WIDTH I <br /> EXCAVATE'1 AWER'DUTCH CREEK CHANNEL J $229,100 J 900 75 10 1450W I A UPSTREAM TOP WIDTH J <br /> I I I I I <br /> EXCAVAIL'UPPER'DUTCH CREEK CHANNEL I $I7,588 I AM 75 10 11111 I A J <br /> i I I I I <br /> --------- --------- <br /> I I ROCK I ROCK(CHANNEL LINING) I I <br /> I I I OAD AND I ___ -• I I <br /> J I HAUL I LENGTH WIDTH DEPTH VOLUME ( J <br /> COST 1 00 (h) (R) (yd-3) I I <br /> I I I I I <br /> 1.RECONSTRUCT'LOWER'DUTCH CREEK CHANNEL 1 $8.921 I wo 20 3 2000 I C,O.E,F•1/2 OF ROCK TRUCKED J <br /> TO CHANNEL FROM ON-SITE SOURCE 1 <br /> 2.CONSTRUCT UPPER•DUTCH CREEK CHANNEL I I 400 20 3 889 I NO ROCK IMPORTING NEEDED- I <br /> ! 1 J I USE ALL LOCAL ROCK I <br /> I I J ROCK(CHANNEL LINING) I I <br /> I ROCK I --_... •---- <br /> i J PLACEMENT I LENGTH WIDTH DEPTH VOLUME J J <br /> J ( COST I (h) (n) (h) (yd-3) I I <br /> I I I I I <br /> 1,RECONSTRUCT'LOWER'DUTCH CREEK CHANNEL I 581,600 ! 900 20 3 2000 I B I <br /> I I I I I <br /> 2,CONSTRUCT'UPPER'DUTCH CREEK CHANNEL I $27.378 1 400 20 3 W9 I 6 I <br /> I I I I I <br /> REVEGETATION AND FISH&WILDLIFE COSTS I S20,000 I I FROM DAYLAN FIGGS•OSM J <br /> I I I I I <br /> »_ — ...—_ �_ _ —__ --.•...�_—___ — — I - ---------------------- <br /> I I I I I <br /> SUBTOTAL I SW2,554 I I I <br /> f I I I I <br /> I ! I I I <br /> 10 PERCENT CONTINGENCY COST I $36,255 I I 1 <br /> I I I i I <br /> I 1 I 1 I <br /> TOTAL ( w".900 <br /> I I I I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.