Laserfiche WebLink
STATE, OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 131 3 Sherman St, Room 215 <br /> Denver, Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX (303) 832-8106 <br /> DEPARTMENT, <br /> NATURA <br /> MEMO <br /> RESOURCI <br /> Rov Romer <br /> September 21, 1994 Governor <br /> James S Lochhead <br /> Executive Director <br /> c uti <br /> TO: Mined Land Reclamation Bo d, Michael Long E a Long <br /> Division Director <br /> FROM: Steven Renner. <br /> RE: Mid-Continent Resources Coal Basin Mine Update <br /> Mid-Continent Resources is no longer participating in the <br /> reclamation of the mine site. The Division is in the process of <br /> contracting the reclamation work through the competitive bid <br /> prL,;ess utilized by the Inactive Mines Program. I am currently <br /> assigned to the Inactive Mines Program, and we are working <br /> together to mesh the competitive bid process with the reclamation <br /> requirements contained in the Coal Regulations and within the <br /> Coal Basin Permit. <br /> On September 11, 1994 , the Division hosted a pre-bid meeting at <br /> the mine site for the purpose of allowing contractors the <br /> opportunity to view the reclamation work to be accomplished this <br /> year. Fifteen reclamation contractors attended the pre-bid. The <br /> bids will be opened on September 27, 1994 . The objectives cf <br /> reclamation this year are to regrade, topsoil and revegetate the <br /> Sutey Refuse Disposal Area. Three drainage channels will also be <br /> constructed at the Refuse Disposal Area. Also included in the <br /> project will be revegetation of the Number 5 Mine. This area was <br /> seeded in 1993 by Mid-Continent, but the effort was unsuccessful <br /> in achieving adequate vegetative cover. A number of maintenance <br /> activities will also be accomplished in order to minimize the <br /> impacts of runoff to the adjacent streams. Construction is <br /> scheduled to begin on October 7, 1994, and is scheduled to be <br /> completed by November 24 , 1994 . It is possible ,that severe <br /> winter weather conditions will force portions of the project to <br /> be completed in the Spring of 1995. 1 / <br /> Assuming that sufficient funds are available, the Division will <br /> contract out reclamation of Mines 1, 2 , 3 , the associated haul <br /> roads and the Number 5 Mine haul Road. A number of access and <br /> light use roads at these mines will also be reclaimed. The Rock <br /> Tunnel Waste Dump and portions of the Old Refuse Disposal Area <br /> will also be included in the 1995 reclamation. <br />