Page 7 <br /> These structures should be buried in place. Otherwise, they could be moved a <br /> short distance, from the Sutey pile to the embankment behind the wash plant, <br /> where the approved reclamation plan specifies that rubblized concrete materials <br /> from the area will be placed. These footings are heavy (estimated 2 tons each) <br /> and cumbersome. They cannot be excavated and transported to the Mines 1, 3 <br /> or 4 entries without considerable effort and expense. <br /> Greg Lewicki's comment: <br /> The expense of using a loader and trucks to do this compared to the net <br /> gain in backfill at the portal areas of only a few cubic yards is not practical. <br /> Also, DMG is vague about what actually will be required for this task, yet a <br /> lump sum bid is requested. This only leads to inflated bid prices. <br /> The contractor's risk is further increased by the broad, open-ended maintenance <br /> requirement. <br /> DMG Bid Document <br /> Maintenance <br /> The CONTRACTOR shall maintain the areas until all work on the entire contract <br /> has been completed and accepted. Maintenance will consist of the repair of <br /> areas damaged by erosion, wind, fire or other causes. Such areas shall be <br /> repaired to reestablish the condition and grade of seedbed and shall be <br /> refertilized, reseeded, remulched and/or reestablished as directed by the <br /> PROJECT MANAGER. <br /> Page 18 <br /> Other open-ended contingencies, including equipment rental provisions, mean <br /> further increase in the price quoted. <br /> DMG Bid Document <br /> TASK 5 EQUIPMENT RENTAL <br /> A backhoeAoader may be used to accomplish miscellaneous site maintenance <br /> tasks as directed by the PROJECT MANAGER. This work may include the <br /> partial dredging of sediment ponds or clean out of existing diversion ditches. <br /> Any excavated materials resulting from pond or ditch maintenace would be <br /> loaded into a dump truck, and hauled to the Rock Tunnel Waste Rock Dump for <br /> disposal. <br /> Any additional `dozer, backhoeAoader or truck work required will be covered <br /> under this task....Bid hourly rate shall reflect the CONTRACTORS estimate for <br /> equipment and personnel costs per hour to complete the task....All of the hours <br /> outlined in Item 5 are NOT guaranteed. <br /> Page 9 <br /> Greg Lewicki's comment: <br /> MCR Objections/DMG Bid <br /> Page 16 <br />