Laserfiche WebLink
Remove power lines and poles <br /> Remove or block culverts <br /> Narrow road to stabilize in- and outslopes as needed by <br /> cutting from outslopes and placing on inslope <br /> Direct drainage as sheet flow over road sides <br /> Construct cut-out trenches (rolling dips) <br /> Re-establish existing drainages <br /> Construct low water crossings as needed <br /> Rip and seed roadway <br /> Broadcast seed unvegetated cut and fill slopes <br /> Mine 3 Coal Transfer Station and Belt Line <br /> Push coal fines to base of cut <br /> Remove foundations to base of cut <br /> Backfill from outside edge of bench to base of cut <br /> Remove sediment ponds <br /> Rip and seed remnant bench area <br /> Broadcast seed fill slope <br /> Divert drainage from belt line right of way <br /> Rip rap erosion channels along belt line right of way <br /> Broadcast seed belt line right of way <br /> Mine 3 <br /> Demolish foundations <br /> Remove trash and debris to trench at base of highwall <br /> Backfill entry area <br /> Broadcast seed mine bench outslopes <br /> Stabilize mine bench outslopes <br /> Road B to Roads C/D Intersection <br /> Remove powder magazines <br /> Remove or block culverts <br /> Remove power lines and poles <br /> Narrow road width by cutting outslopes in places <br /> Remove cut material to Rock Tunnel Waste Dump <br /> Direct drainage as sheet flow over road sides <br /> Construct cut-out trenches (rolling dips) <br /> Re-establish existing drainages <br /> Construct low water crossings as needed <br /> Rip and seed roadway <br /> Road D <br /> Remove powder magazines <br /> Remove sediment ponds <br /> Remove power lines and poles <br />