Laserfiche WebLink
Remove overland conveyor from face up to storage area <br /> Remove remaining facilities <br /> Remove twelve feet culvert from Dutch Creek <br /> Remove fill from Dutch Creek <br /> Remove fill from North Fork Dutch Creek <br /> Divert Rock Tunnel discharge into Dutch Creek <br /> Backfill Rock Tunnel face up with drainage fill materials <br /> Rip and seed remaining areas <br /> Road E <br /> Remove cut material from road outslope above landslide <br /> Direct drainage as sheet flow over road side <br /> Rip and seed roadway from base to Road G intersection <br /> Broadcast seed road outslope from 1st switchback to Road G <br /> Road G <br /> Remove power lines and poles <br /> Narrow road to stabilize in- and outslopes as needed by <br /> cutting from outslopes and placing on inslope <br /> Remove or block culverts <br /> Direct drainage as sheet flow over road sides <br /> Construct cut-out trenches (rolling dips) <br /> Re-establish existing drainages <br /> Construct low water crossings as needed <br /> Rip and seed roadway <br /> Broadcast seed unvegetated cut and fill slopes <br /> Mine 5 <br /> Revegetate backfilled area <br /> Remove sediment pond <br /> Mine 5 Fan Access Road <br /> Remove or block culverts <br /> Direct drainage as sheet flow over road sides <br /> Construct cut-out trenches (rolling dips) <br /> Re-establish existing drainages <br /> Construct low water crossings as needed <br /> Rip and seed roadway <br /> Broadcast seed unvegetated cut and fill slopes <br /> Mine 5 Fan Entry <br /> Grade bench area to control runoff <br /> Rip and seed area <br /> Broadcast seed outslopes <br /> Road F <br />