My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (252)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (252)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:52:11 AM
Creation date
6/20/2012 10:04:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1993 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mid-Continent Resources Mine#5 <br /> A Ditch (Ditch Segment B) will extend around the outer perimeter of the yard <br /> area. It will continue from Ditch Segment A, which is upslope to the west of <br /> Segment B, and continue to Segment C, which is downslope, to the east and <br /> flows to the sediment pond. <br /> Sector 3-B <br /> Flows from the ravine will be directed toward Ditch Segment C. The slope of the <br /> yard area on either side of the current ditch (Ditch Segment D) will be moderated <br /> to a gently rolling dip. <br /> It is not anticipated that fill material will be placed against the base of the hillside <br /> in this area. <br /> Sector 3-C <br /> Topsoil will be removed from the topsoil stockpile and spread on the adjacent <br /> graded areas. The sediment pond will remain, with flows routed through Ditch <br /> Segment C to the pond. <br /> Material excavated from the turn-of-the-century spoil pile will be transported to <br /> the fill at the base of the hill (Sector 3A). <br /> A topsoil borrow area will be designated from the meadowland east of the <br /> graded area. When topsoiling has been completed, the borrow area will be <br /> graded and seeded. <br /> On completion of grading, the roadway extending around the pond, to the lower <br /> portion of the graded area, will be ripped. This area will be seeded in the fall. <br /> Topsoil/Seeding <br /> Topsoil cover will be spread over graded areas to a depth of 6", unless the soil in any <br /> reclaimed area seems suitable as a growth medium, in which case it will be ripped. <br /> Topsoiled areas will be tracked over with the dozer to roughen the surface. <br /> The graded areas, fill slopes and topsoil areas will be seeded and mulched. <br /> Sediment ponds and ditches will be retained until vegetation is well established. <br /> 5 <br /> 07/14/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.