My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (248)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (248)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:45:19 AM
Creation date
6/20/2012 8:43:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1992 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOBEF'T ElELH11E''' T E L Hci . '1=1--'+4'_�-2'1=1- hip_ „ . 7i=i ` 2 12 45 P . i= 2 <br /> MID-CONTINENT RESOURCES <br /> P.0, Box 1298 <br /> Glenwood Springs, CO 81602 <br /> Anthony J. Waldron <br /> Reclamation Specialist <br /> DMG <br /> 1313 Sherman St. <br /> Room 215 <br /> Denver, CO 80203 <br /> November 30, 1992 <br /> Dear Mr Waldron, <br /> Issues we would like to discuss with the Division at our meeting of Wednesday, <br /> Dec 2 include the following: <br /> Seating Plan. <br /> Next summer we anticipRte sealing portals and openings. A plan has been <br /> submitted to MSHA which proposes filling most portals with at least 26 of <br /> incombustible material. This would be accomplished by heavy equipment <br /> pushing material into the openings, or if allowed, by dynamiting them shut. <br /> Those openings at whirl-i there is a potential for impoundment of water would be <br /> equipped with a, U shap,sd drain This includes the rock tunnel. <br /> The current a proved plan of the (MLRD) permit calls for "impervious" seals, and <br /> anticipates impounding water in the rock tunnel by construction of a series of <br /> seals. We believe this would be unadvisable, that allowing impoundments would <br /> not be in the best interests of safety. Accordingly, we do wish to change the <br /> plans described in the rermit. We have indicated to MSHA that we would like to <br /> use the dynamiting method for portal sealing in those areas which are difficult to <br /> access with heavy equipment. If this alternative is not allowed by MSHA, some <br /> surface disturbance will likely be necessary to get equipment in to these sites. <br /> We consider the sealing of portals to be our first priority for work during 1993, <br /> The order of sealing wHc' rtal/opening when should be dictated by <br /> considerations such as th -,st efficient use of equipment, etc. <br /> Downslopes Below Portal Benches <br />
The URL can be used to link to this page
Your browser does not support the video tag.