Laserfiche WebLink
As structures are removed from the prep. plant/yard area, proceed with breaking <br /> up foundations, grading. <br /> As structures are removed from the Carbondale load-out site, proceed with <br /> break-up of foundations, backfill/grading. <br /> As preparation plant is dismantled, remove asbestos, dispose of it (possibly at <br /> mine site). Coal material on the ground should go to the Sutey refuse disposal <br /> site, or if allowed, be pushed up against the hillside and buried. <br /> Cover all or part of permanent tunnel fill area (some area should be left to <br /> borrow material for backfill, coverage of trash pile, etc.) <br /> During the fall, seed areas on which grading has been completed during the <br /> preceding summer. <br /> 1996. <br /> Complete grading at preparation plant area (assuming structures have been <br /> removed) and fundations broken up. <br /> Complete coverage of Sutey refuse pile. <br /> Cover trash pile. Complete topsoiling of permanent tunnel fill area. <br /> Reclamation Schedule <br /> 4 <br />