Laserfiche WebLink
Terry Tunnel Bulkhead <br />Page 3 <br />Please call with your acceptance or refusal of this documentation <br />that the design assumption is valid or if you have any questions. <br />It is anticipated that this bulkhead will be poured on 09/01/94 if <br />your approval is received for this documentation. The planned <br />8/31/94 pre -pour inspection by DMG should allow a fairly complete <br />inspection if this pour date is going to be made. I will give you <br />a copy of the pre -pour flow measurements during the site <br />inspection. It appears that the flow will be around 160 GPM which <br />will require minimal head to pass through the 6 inch pipe. <br />cc: Patricia Nelson, CDH <br />Chris Hayes <br />LP /cjm <br />Sincerely, <br />Larry Perino <br />Superintendent- Technical Services <br />