My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-08-29_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1994-08-29_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 6:47:52 PM
Creation date
6/20/2012 7:49:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
8/29/1994
Doc Name
Bulkhead Wall Irregularity.
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Tunnel Bulkhead <br />Page 3 <br />Please call with your acceptance or refusal of this documentation <br />that the design assumption is valid or if you have any questions. <br />It is anticipated that this bulkhead will be poured on 09/01/94 if <br />your approval is received for this documentation. The planned <br />8/31/94 pre -pour inspection by DMG should allow a fairly complete <br />inspection if this pour date is going to be made. I will give you <br />a copy of the pre -pour flow measurements during the site <br />inspection. It appears that the flow will be around 160 GPM which <br />will require minimal head to pass through the 6 inch pipe. <br />cc: Patricia Nelson, CDH <br />Chris Hayes <br />LP /cjm <br />Sincerely, <br />Larry Perino <br />Superintendent- Technical Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.