Laserfiche WebLink
Recommended locations for bromide monitoring after bulkhead placement are as <br /> follows: <br /> 1 ) discharge from the American Tunnel portal, <br /> 2) flow in the ditch (if any exists) in the American Tunnel downstream of <br /> the bulkhead, <br /> 3) discharge (if any exists) from the Terry Tunnel portal, <br /> 4) discharge from the lower Mogul Mine portal, <br /> 5) discharge from the Silver Ledge Mine, <br /> 6) the spring which flows from the base of the dump near the upper <br /> entrance to the Mogul Mine (in Ross Basin), <br /> 7) Cement Creek downstream of the confluence of the North Fork and the <br /> South Fork (i.e., just downstream from Gladstone), <br /> 8) Eureka Creek just upstream from the Terry Tunnel discharge, <br /> 9) Mogul Spring, and <br /> 10) the small unnamed spring just downhill from the Adams Mine. <br /> The following schedule of monitoring is recommended (subject to modification <br /> depending on the actual rate of mine flooding): <br /> Monthly sampling and analysis for bromide from all accessible monitoring <br /> locations (listed above) for the first year after installation of the proposed <br /> bulkheads. <br /> Quarterly sampling and analysis from all accessible monitoring locations for the <br /> second year following bulkhead installation. <br /> Annual monitoring for the following five years. <br /> sunny\wp\Lraci\2251\Workplan.693 14 <br /> Nol simon HYDRO-SEARCH <br />