My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-24_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1993-09-24_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 6:44:09 PM
Creation date
6/20/2012 7:48:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
9/24/1993
Doc Name
Work Plan to Perform a Tracer Test
From
Simon Hydro- Search
To
Sunnyside Gold Corp
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended locations for bromide monitoring after bulkhead placement are as <br /> follows: <br /> 1 ) discharge from the American Tunnel portal, <br /> 2) flow in the ditch (if any exists) in the American Tunnel downstream of <br /> the bulkhead, <br /> 3) discharge (if any exists) from the Terry Tunnel portal, <br /> 4) discharge from the lower Mogul Mine portal, <br /> 5) discharge from the Silver Ledge Mine, <br /> 6) the spring which flows from the base of the dump near the upper <br /> entrance to the Mogul Mine (in Ross Basin), <br /> 7) Cement Creek downstream of the confluence of the North Fork and the <br /> South Fork (i.e., just downstream from Gladstone), <br /> 8) Eureka Creek just upstream from the Terry Tunnel discharge, <br /> 9) Mogul Spring, and <br /> 10) the small unnamed spring just downhill from the Adams Mine. <br /> The following schedule of monitoring is recommended (subject to modification <br /> depending on the actual rate of mine flooding): <br /> Monthly sampling and analysis for bromide from all accessible monitoring <br /> locations (listed above) for the first year after installation of the proposed <br /> bulkheads. <br /> Quarterly sampling and analysis from all accessible monitoring locations for the <br /> second year following bulkhead installation. <br /> Annual monitoring for the following five years. <br /> sunny\wp\Lraci\2251\Workplan.693 14 <br /> Nol simon HYDRO-SEARCH <br />
The URL can be used to link to this page
Your browser does not support the video tag.