My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-10-19_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1994-10-19_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2021 8:25:34 PM
Creation date
6/20/2012 7:48:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/19/1994
Doc Name
Cement Creek Conjunctive Flow Characterization
From
Golder Associates
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 1994 -2- 933-2713.003 <br /> 3.0 GEOLOGY <br /> 3.1 Field Activities <br /> The field program for this project was performed between March 14 and 25, 1994 and consisted <br /> of drilling seven boreholes at the Sunnyside Mine. Borehole details are given in Table 1. The <br /> borehole drilling was conducted in order to characterize the stratigraphy of Cement Creek <br /> sediments, verify the depth to bedrock, and verify the depth to groundwater in the sediments. <br /> The drilling was performed by L.A. Smith of Grand Junction, Colorado, using an Acker drill <br /> rig. Soil and rock samples were collected by continuous coring with HX rods in a 3.5 inch <br /> diameter hole. Continuous collection of core samples allowed visual characterization and <br /> logging of the materials in order to develop a vertical profile of the sediments. Samples were <br /> classified in accordance with the Unified Soil Classification System. Representative samples of <br /> clay and clayey gravel were also collected for laboratory testing. Borehole logs are included as <br /> Appendix A. <br /> The boreholes were drilled along two cross sections (A-A' and B-B'), nearly perpendicular to <br /> Cement Creek, as shown on Figure 1. <br /> Golder personnel designated the boreholes as BH-1 through BH-6. Sunnyside has subsequently <br /> renamed those boreholes which were completed as piezometers using "A" and "B" prefixes. <br /> The following table compares the Golder designations and the Sunnyside designations: <br /> Golder Designation, Sunnyside Designation <br /> BH-1 B-1 <br /> BH-1 A N/A <br /> BH-2 B-2 <br /> BH-3 N/A <br /> BH-4 N/A <br /> BH-5 A-1 <br /> BH-6 A-2 <br /> Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.