Laserfiche WebLink
B-L Brenneman Secondary Bulkhead <br /> Construction Certification Report <br /> Page 4 <br /> The bulkhead rock-concrete contact has been grouted to <br /> specifications and all indications are that the low pressure <br /> grouting was successful and complete. <br /> The B-L Brenneman Secondary Bulkhead construction meets or exceeds <br /> all design specifications and conforms to all design assumptions as <br /> reported above. In addition, the commitment to place limestone at <br /> the water side of the bulkhead has been completed with the <br /> placement of 5000 lbs of crushed limestone against the water side <br /> of the bulkhead. <br /> The approximate center of the design water-side of the bulkhead is <br /> at coordinates 17 , 499. 23 N, 19,522. 91 E at an elevation of <br /> 12, 148 . 34 feet. These coordinates are based on a coordinate system <br /> with USLM Moultrie being at coordinates 11, 964 . 00 N, 20,000. 00 E at <br /> an elevation of 12, 728 . 73 feet. <br /> Larry Roger Perino, P.E . <br /> Colorado Registration #24138 <br /> cc : Patricia Nelson - CDH <br />