Laserfiche WebLink
F-L Brenneman Primary Bulkhead <br /> Construction Certification Report <br /> Page 4 <br /> The F-L Brenneman Primary Bulkhead construction meets or exceeds <br /> all design specifications and conforms to all design assumptions as <br /> reported above. In addition, the commitment to place limestone at <br /> the water side of the bulkhead has been completed. Because the <br /> potential exists for both sides of the bulkhead to be exposed to <br /> impounded water , 7500 lbs of crushed limestone was placed at each <br /> face of the bulkhead. <br /> The approximate center of the design water-side of the bulkhead is <br /> at coordinates 17 ,602 .62 N, 19,433 . 01 E at an elevation of <br /> 11, 588 . 42 feet. These coordinates are based on a coordinate system <br /> with USLM Moultrie being at coordinates 11 , 964 .00 N, 20 ,000. 00 E at <br /> an elevation of 12, 728 . 73 feet. <br /> Larry Roger Perino, P.E . <br /> Colorado Registration #24138 <br /> cc : Patricia Nelson - CDH Al q_'A i3, i774 <br />