Laserfiche WebLink
.,MAY 27 '97 09:21AM DIV/MINERALS&GEOLOGY P.3f3 <br /> control for the Northern mining area", you will get this sentence inserted directly into <br /> your completeness letter and your public notice,including all the shorthand, capitals, etc.' <br /> exactly as you see them. The sentence should be entered into the database as "This <br /> revision requests approval to relocate an underground main ventilation shaft from it's <br /> current location near the main mine facility to a location 300 feet west of County Road <br /> #33 in Section 32 of T33N, R91W. Sediment control for the ventilation shaft facility is <br /> also being revised as a result of this revisiom_" <br /> $. Now for the acreage database update goodies.-Below are 7 definitions"(for lack of a better <br /> term) to assist you in determining the acreage information that each site needs to have <br /> updated in the database. <br /> Disturbed - As defined in the coal regs. Determine the amount of disturbed area as <br /> approved by revision-at the time you are doing this excerise. It is not what is actually on <br /> the ground, but what is approved to be disturbed. Make sure it is current and does not <br /> include revisions which have yet to have a decision rendered. <br /> Affected - The above value for Disturbed plus the acreage above the underground <br /> workings (as applicable) including the angle of draw. This can be digitized from the. <br /> required map which depicts this area. If you are a surface mine, Affected=Disturbed. <br /> Life of Mine -Not real important to coal,make it equal to the permit acreage except for <br /> those mines who have provided a life of mine acreage that is much larger than the <br /> disturbed acreage. <br /> Permit - The area bounded by the permit boundary, as shown on the'map(s). <br /> Maximum Allowed - This should be entered as zero. <br /> Federal, State,Private, and County - These fields should be the appropriate amount of <br /> surface ownership for each one of these entities. Guess what? The total of these four <br /> fields should equal the value input for Permit acreage. If not, you have done something <br /> terribly wrong and may be severely beaten about the head and shoulders. <br /> Now FOR YOUR ASSIGNMENT <br /> In order for clerical to stop having to modify every letter three times and so the specialists <br /> can complete letter generation prior to the next asteroid impact, we need to get this <br /> inf6nnation updated gujigkjy-. You will be asked nicely once to complete this task quickly- <br /> PLEASE COMPLETE THIS TASK QUICKLY, OK? PLEASE? There. Now you have <br /> been asked nicely. Please provide.this information to KAG, band written legibly on a <br /> piece of paper or parchment of your choice for each of your assigned mines, no later than <br /> April 4, 1997. <br /> If you have questions or need special help, let me know. <br />