bask# Task Description 1991 Bond MCR King DMG Remaining Actual Cost Actual Cost Comments Comments& Backup <br /> Estimate Work Work Work Work RemainingWork <br /> 9 Finish Grade the $40,983 $7,809 $0 $17,926 $15,248 $10.000 The actual cost is slightly less than the The bond cost for this task is based on <br /> Entire Site calculated amount using the bond since the moving 6" of material an average distance <br /> rough grading and finish grading are usually of 100'on the milder areas which consists of <br /> combined and costs for both are slighltly 265 acres, or$154.65 per acre. Referring to <br /> overestimating what is actually done on the job. the acreages remaining for mild slope <br /> vegetation(113.6 acres)and subtracting 15 <br /> acres between the prep plant and the rock <br /> tunnel area which have not been revegetated <br /> but have been graded results in an acreage <br /> of 113.6- 15.0=98.6 yet to be completed, <br /> resulting in a remaining cost of S15,248. <br /> Prior to DMG takeover, MCR did rough <br /> grading on the rock tunnel waste pile, part <br /> of the Sutey refuse pile, Mine#5 and the old <br /> refuse pile totaling 50.5 acres or a cost of <br /> $7809. The DMG completed grading at the <br /> remaining portal areas, the remainder of the <br /> Sutey Pile and the roads to Mines 3 and 5 <br /> and part of the roads to Mines 1 and 2. <br /> 10 Sediment Pond $28,133 $0 $0 $0 $28,133 $0 It is unlikely that the DMG will remove the All ponds currently remain in place and it is <br /> Removal sediment ponds, therefore the actual cost of the doubtful that the DMG will remove the <br /> remaining work is $0. ponds. Nevertheless, the full cost is included <br /> in remaining work. <br />