Laserfiche WebLink
SUMMARY OF RECLAMATION TASKS REMAINING TO BE ACCOMPLISHED AT <br /> COAL BASIN. A DESCRIPTION OF EACH TASK, AND OF ITS COMPONENTS, WHERE <br /> NECESSARY, AND THE SOURCE OF THE REQUIREMENT IS INCLUDED. THE COST <br /> OF PERFORMING THE TASK, INCLUDING ITS COMPONENTS IS ALSO INCLUDED. <br /> IN ORDER TO OBTAIN THE TRUE COST OF RECLAMATION, SEE TABLE GROUPING <br /> TASKS INTO LOGICAL PROJECT UNITS, OR BIDS. <br /> RECLAMATION DESCRIPTION REFERENCE SUB TASKS TO <br /> TASKS AND FACTORS INCLUDE: <br /> Roads A,B,C,D interim and final TR 15; renewal reclaim disturbances <br /> plans. Move to final application, pg 21; created to accomplish <br /> in order to expedite see also 4.03.3, 4.15, reclamation <br /> DMG exit & closure 3.02.2, 4.06.4, <br /> of liquidation plan. 4.05.1(4), Findings <br /> Mechanically flatten XIX <br /> cut crests to obtain <br /> material to mimic <br /> natural sloughage <br /> over 30(?) years. <br /> Achieve 1.3 FOS. <br /> Use trackhoe to <br /> moderate downhill <br /> slope of roads <br /> Huntsman Ridge veg success defined 10-18-85; see also 9- <br /> Road as herbaceous cover 11-84 submittal <br /> at 79%, woody plant <br /> density of 100 trees <br /> and 500 shrubs (per <br /> acre?), 2 cool season <br /> grasses 7 forbs 1 <br /> shrub to make up 3% <br /> min. Of relative rec'1 <br /> cover; <br /> Road cut and fill Revegetate to MR 35, PR 03 <br /> slopes stabilize; Findings (Section <br /> XIX, pg 11; Renewal <br /> pg 22 <br />