My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (232)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (232)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:11:54 AM
Creation date
6/19/2012 2:59:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1998 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please collect the following original 1311) SCHEDULES: <br />Bid Schedules for Road Reclamation Project: Dirt -N -Iron, two pages; Ray Ward Trucking, one <br />page, Bogue Construction, onc page. <br />Bid Schedules for Coal Basin Wastc Rock Dump Reclamation Project T.?RM Enviroclean, <br />Kessler, Wagner Construction, one page each. . <br />Bid Schedules for Coal Basin Mine 3 Reclamation Project: Rinderle Construction, Mountain <br />Environmental, Bogue Construction. onc page each. <br />Bid Schedules for Coal Basin Mine 1 and 2 Reclamation Project: Ray Ward Trucking, Bogue <br />co struction, Rinderle Construction, two a • es each. <br />Bid Schedules for Coal Basin Sutey and Old Refuse Piles Reclamation Project: Bogue <br />1 6-/- � Construction, Preston Meese, one page each. <br />MAR. 3 '98 11:05AM DMG,GJCT <br />1 303 2410336 P.3 <br />QD Bid Schedules for Warehouse Vicinity Project: Ray Ward Trucking, Berry Trucking, Dirt- N -lron. <br />J two pages each. <br />,kk,) Bid Schedule for Coal Basin Rock Tunnel Projcct: ERM Enviroclean, one page. <br />e rr - Bid Schedule for Coal Basin Mine 4 Reclamation Project: Ray Ward Trucking, one page. <br />Bid Schedule for Coal Basin Mine 4 Revegetation Project: Western States Reclamation, onc page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.