My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (232)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (232)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:11:54 AM
Creation date
6/19/2012 2:59:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1998 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction <br />activities and ensure that each work item is completed and constructed to design specifications. <br />The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 <br />P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without prior <br />approval of the PROJECT MANAGER. It is the CONTRACTOR'S responsibility to <br />schedule inspections with the Project Manager so as not to delay the work. The following items <br />must be observed and approved by the PROJECT MANAGER before proceeding with additional <br />work: <br />1. Staking of project area at Old Refuse Pile <br />2. Completion of topsoil salvage operations at Old Refuse Pile <br />3. Completion of topsoil salvage and vegetation clearing operations at fill areas, Old <br />Refuse Pile <br />4. Completion of topsoil salvage and vegetation clearing operations at under drain <br />locations, Old Refuse Pile <br />5. Upon completion of geotextile placement in underdrain trenches. <br />6. Upon completion of rock placement in underdrain trenches. <br />7. During fill compaction of first lift of refuse disposal at both Old Refuse Pile, and <br />disposal sites. <br />8. Upon completion of 1/4 of topsoil placement, Old Refuse Pile. <br />9. Immediately prior to initiating revegetation operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.