TASK 5 EQUIPMENT RENTAL <br />Additional areas in and adjacent to the project area may require slope reduction, excavation or <br />erosion control work. A CAT D -7H or equivalent 215 FHP machine with operator, a CAT <br />416B Backhoe loader or equivalent 74 fhp machine with operator, and a five (5) cubic yard <br />on/off highway end dump truck with operator shall be furnished for additional work as needed. <br />The hours outlined in Item 5 of the Bid Schedule are NOT guaranteed. All work will be <br />accomplished according to Specification 19.0, Equipment Rental, attached. <br />Measurement and Payment <br />Measurement and payment will be made as per Specification 19.0, Equipment Rental, which is <br />attached. Payment will be made at the unit prices established in Item 5 of the Bid Schedule. <br />The hours outlined in Item 5 of the Bid Schedule are NOT guaranteed. <br />TASK 6 SILT FENCE <br />Sediment containment fences will be Mirafi Prefabricated Silt Fence with Posts, or approved <br />equivalent (Figure 2, Typical'Silt Fence). Silt fence will be installed as per manufacturers <br />specifications. Silt fence may be placed at various locations to minimize the transportation of <br />sediment from the facility, and will be paid for under Task 6. Placement of silt fencing, if <br />required, will occur concurrently with, or immediately upon completion of top soiling <br />operations. Up to 1,500 feet of silt fence may be installed during completion of this project. <br />Measurement and Payment <br />Sediment containment fences (silt fence) will be measured to the nearest linear foot. Payment <br />for this task will be paid for at prices established in Item 6 of the Bid Schedule per linear foot <br />installed. Installation of 1,500 feet of silt fence IS NOT guaranteed. Such payment shall be <br />considered full compensation for all labor, materials, equipment and all other items necessary <br />and incidental to the furnishing and placement of the silt fences as directed and described in <br />the specifications. Payment will be as this task is completed and approved by the PROJECT <br />MANAGER. Payment for this task will be made only for the unit price shown under Item 6 <br />of the Bid Schedule. <br />TASK 7 UNDERDRAIN CONSTRUCTION <br />PROJECT MANAGER may determine that it is desirable to construct an underdrain(s) where <br />coal refuse is used as fill material in order to obtain the design slope on the north face of the <br />Old Refuse Pile, or at some portions of the disposal site. <br />Underdrains shall be constructed to the following specifications <br />(1) PROJECT MANAGER will identify the location of the underdrain in the field. This will <br />be accomplished prior to beginning fill or disposal operations. Prior to beginning construction <br />19 <br />