Laserfiche WebLink
GREG LEWICKI <br />May 21, 1998 <br />Steve Renner <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street 2nd Floor <br />Denver, CO 80203 <br />Dear Steve: <br />TEL : 1- 303 - 629 - 9335 Maw 22 , 98 20:35 No _ 001 <br />Greg Lewicki And Associates <br />Some items which we still need to resolve are listed below: <br />1645 ("surf Plate, Suite 309 Plioae. /Fax: (303) 629 -9335 <br />Deaver, CO USA 80202 E -Mail: ltwiekiaenvisionet.det <br />Re : MCR Coal Basin Reclamation <br />1 want to thank you and Jim McCardle for visiting with me at the minesite. It was a <br />productive meeting and 1 think we arc basically in agreement with the reclamation <br />work on the private lands. <br />1) the final slopes of the approximate 2 acre area for rubble disposal. As we discussed, <br />Mr. Delaney would like to see as much flat area as possible in this area, provided that <br />the costs of doing so are within reason. I have enclosed a sketch of what l feel is the <br />current plan and a sketch of what is desirable to the landowners. Please let me know of <br />the approximate costs for making this change and we will then decide what to do. <br />2) We will try to determine the status of the existing 10 inch water line that exists <br />under Road A from the rock tunnel portal. If this can be used to handle the water from <br />the portal, the ditch which is planned for this area (700' long) may not he needed. We <br />realize that this discharge is still regulated by CDOH and we will likely need their <br />approval for the change. It would he used as a source of water in the lower ponds on <br />the property. <br />3) We are in agreement as to the final work on the upper sediment ponds - taking out <br />the discharge pipes and installing a rock -lined spillway with no further work. We <br />would like to see this work done before any further road reclamation is undertaken. If <br />you can find out if the (:1X)11 will allow this plan for the ponds, let me know. As we <br />discussed, many of the ponds on the lower property should remain at the request of the <br />landowners and the principal spillway pipes should remain on these ponds. 1 agree that <br />the box culvert to the Sutey ponds should be replaced with a low water crossing. <br />