South Basin Road Reclamation Project: This Project, which is estimated to cost $197,582, <br /> would be funded by the bond. This Project would complete reclamation of the remaining roads <br /> within Coal Basin. Due to the logistics and timing of completing this and the steep slopes <br /> Projects, road reclamation must lag behind the steep slope revegetation by one season. This <br /> means that, if the litigation proceeds to an August 1999 hearing, and as a result the steep slopes <br /> revegetation project is delayed until 2000, the road reclamation would not be accomplished until <br /> 2001. <br /> Pond Removal Project: This Project will be completed using bond money. The estimated cost <br /> is $78,128. Assuming Water Quality Control Division approves the removal of the ponds, it <br /> would be possible to accomplish this Project as apart of the road reclamation job. If removal of <br /> the ponds is not received, then the ponds would be removed at a later date. <br /> Spring Maintenance: Cost Projected at less than 10,000, and will be funded by bond money. <br /> This is a bid for on-call machine time in the event a problem arises at the site during snow melt <br /> runoff. <br /> 2001 and Beyond <br /> Mine Site Maintenance: Cost Projected at $105,000. This will allow for periodic maintenance <br /> of the site over the course of a five to ten year period, if need be. Issues to be addressed include <br /> reseeding in the event of failure or insufficient establishment, rill and gully repair and minor land <br /> form modification, stream channel repair and erosion control as needed. <br /> cc: Jim McArdle <br />